Go to Home Page
  Library Media Gallery Still Images At Work in the Fields of the Bomb - 29 of 106

Robert Del Tredici - At Work in the Fields of the Bomb

29. DuPont Administration Building, Savannah River Plant

Harry Truman signed the Savannah River Plant into existence in 1950. Its mission: to produce plutonium and tritium for America's H-bomb program. The prime contractor was DuPont, which cleared 312 square miles and moved four communities to build five plutonium reactors, a tritium facility, two chemicals separations plants, a heavy-water plant, hight-level waste tanks, a low level radiation dump, a Navy submarine reactor fuels materials facility (1986), and, by 1989, a defense waste-processing plant for turning high-level nuclear waste into glass logs. The plant employs 15,000 people. Aiken County, South Carolina. August 6, 1983.

Previous | Next


Buy This Book


 


Previous | Next

Text and pictures put online with permission of author.
All text and picture is © Copyright Robert del Tredici.